1100 Broadway St
1100 Broadway St
Under Construction
Second apartment building of the larger 1140 Broadway project. Includes a small amount of ground floor retail space. Uses the neighboring Beekman on Broadway's parking structure.
1101 S University
1101 S University
Stalled
Multi story addition to the Espresso Royale building at the corner of S and E University. The new floors would consist of three large residential units. This building is surrounded on two sides by the Vic Village North development. No updates in over a year as of mid 2019 - seems likely stalled.
115 Research Dr
115 Research Dr
Stalled
Two floor small office building off of North Main St. No updates on this project in over a year as of mid 2019 - seems likely stalled.
1215 S University
1215 S University
Stalled
4 story mixed office and retail building on South University. No updates on this project since late 2016.
123 W Summit
123 W Summit
Concept
City owned site being considered for affordable and / or market rate housing. Different options are being looked at ranging from 7 townhomes to 19 apartments. The data shown here is from the 7 townhouse concept.
This is part of larger site that is the former location of the Ann Arbor city fleet. Most of the land on that site (721 N Main) is in the floodplain and is marked as being a key part of the Treeline greenway proect.
132 Hill Street
132 Hill St
Complete
Small student targeted apartment building southwest of campus containing 5 units with 4 to 6 bedrooms. Similar to the recently completed development across the street.
143 Hill Street
143 Hill St
Complete
4 unit rental building to the the southwest of central campus targeted towards students. 6 bedrooms and 3.5 bathrooms per unit - $5400 / month / unit.
1510 E Stadium
1510 E Stadium
Concept
Site proposed by the city council for affordable housing. This is currently the location of the fire prevention office, operating out of an old fire station. Selling this land ties into the fire department's plans to upgrade its facilities.
2000 S Industrial
2000 S Industrial
Concept
Site proposed by the city council for affordable housing. This is currently the location of the Ann Arbor Housing Commission offices.
2050 Commerce Blvd
2050 Commerce Dr
Approved
Apartment building aimed at working professionals on the far west side with 267 units. 29 studios, 170 one bedroom units, and 68 two bedroom units. No obvious progress towards construction as of early 2019. Administrative ammendment to the site plan approved in 2020. Slowly moving towards construction through permitting process as of 2023.
208 W Ann
208 W Ann
Stalled
Small multi family apartment building in the northwest corner of downtown. As of October 2018 it looks like this project has been abandoned and instead the house is being renovated as two apartments.
2111 Packard St
2111 Packard St
Approved
Three story apartment building on Packard with ground floor retail. Would replace the old strip mall at Packard and Anderson. Construction likely to start in 2023.
212 Miller
212 Miller Ave
Approved
Small condo building on the north side of downtown.
212 S State St
212 S State
Under Construction
Five floors of residential micro units above new bathrooms for the Michigan Theater. Located behind Sava's off of State St. Part of the larger 600 E Washington project immediately to the north.
2300 Traverwood Phase 3
2300 Traverwood
Complete
Office building addition for Google off the Plymouth Road corridor.
2625 Jackson Ave
2625 Jackson Ave
Complete
New restaurant and retail building adjacent to Westgate. To host a juice shop and mattress store.
2857 Packard
2857 Packard Rd
Stalled
51 home subdivision on the south east side of Ann Arbor. Project approval was denied by the city. The developer subsequently sued the city. A comprimise proposal, consisting of some attached houses instead of detached ones in order to have less impact on the site, came back for approval in 2019. After being turned down again it was eventually approved as part of settling the lawsuit. As of 2021 the development plans may be in limbo again. An alternative plan was floated in 2021, and there have been no updates since then.
300 S Maple Rd
300 S Maple
Complete
New retail / office building at the site of the former Quarter Bistro. One tenant is set to be Lewis Jewlers.
309 N Ashley
309 N Ashley
Complete
Mid sized condo building on the north side of downtown.
315 S Main St
315 S Main St
Complete
6 floor office building with ground floor retail on Main Street. This is the site of what was the Main Street M Den and other retail. M Den will be moving into the new building when it is complete.
327 E Hoover
327 E Hoover
Stalled
Six unit apartment building with ground floor retail south of downtown near Michigan Stadium. May be in limbo as of 2021. The existing building was demolished in 2021 and the site has been used as an outdoor events venue since.
330 Detroit
330 Detroit St
Under Construction
Triangle building across from the Kerrytown Market consisting of condos and ground floor retail / office space.
410 First
410 N First Ave.
Complete
24 condo units in a 4 story building just north of downtown. Each unit has 1 to 3 bedroom. The target market looks to be empty nesters and young professionals. Move ins are ongoing as of early 2018.
414 Main
414 N Main St
Complete
Townhouse development on Main Street at the north end of downtown.
415 W Washington
415 W Washington
Proposed
Discussions are ongoing about what to do with this abandoned city owned property. Demolition of the old structure is possible in the near term.
417 E Liberty
417 E Liberty
Concept
Ground lease available to build larger building at the Encore Records site on Liberty. Rumor is something is in the works
600 E Washington
616 E Washington
Under Construction
Large mixed use structure proposed on Washington St behind the Michigan Theater.
611 S Ashley
611 S Ashley
Stalled
11 apartment addition to the existing 618 S Main young professional focused apartment building. May be cancelled as of early 2019?
618 S Main
618 S Main
Complete
Apartment building south of downtown on Main Street targeted at young professionals, graduate students, and empty nesters.
950 Greene
950 Greene
Complete
Apartment building southwest of campus with a small amount of retail space. Units are mostly studios and one bedrooms.
A Alfred Taubman Wing - Architecture School
2000 Bonisteel Blvd
Complete
Addition to and partial renovation of the University of Michigan's Art and Architecture Building.
Ann Arbor Campus Hotel
402 E Huron
Stalled
Proposed mid-rise hotel at the site of the auto repair shop at Huron and Division. No updates since fall 2019 and a formal site plan was never filed - may be stalled.
Ann Arbor Housing Commission - Platt East / Lower Platt Project
3451 Platt
Complete
Housing Commission project to develop 4 buildings of low income rental housing on the southeast side of the city. Several low income units that currently exist on the site would be demolished.
Ann Arbor Station
Fuller Rd
Stalled
Planned project to replace Ann Arbor's existing Amtrak Station. The station would be placed above the railroad tracks and would be fronted by a large parking structure in Fuller Park. Subject to much controversy due to the relocation from Depot St to Fuller Park and the cost of the project. This will require a public vote in order to move forward.
Ann Ashley Garage Addition
220 N Ashley St
Stalled
Project to add three new levels containing 375 parking spaces to the Ann Ashley parking structure, bringing the total size to nine levels and 1202 parking spaces. The development may also involve architectural changes to the existing structure and the addition of new retail spaces on the ground floor.
The project was blocked by the city council in 2019, and the COVID-19 pandemic makes the future of this project very uncertain.
ArborBlu
624 Church
Complete
Student apartment tower above Pizza House in the South U area.
Arbour on Main
Valhalla
Approved
Proposal to combine several pieces of property, rezone the land, and build a residential project of apartments and townhomes.
Ashley St Affordable Housing
309 S Ashley
Concept
Concept of new development on the city owned Kline Parking Lot off of S Ashley between William and Liberty. Options under consideration include a mix of affordable and market rate housing: between 150 and 500 units in all, significant ground floor retail space, buildings 10 to 16 floors in height, and up to a 350 space parking garage.
Athletics Operations Center
S State
Complete
Centralized facility for various University athletics related jobs just south of the main athletic complex.
Atwell State Street Retail
3695 S State
Stalled
Two single story retail buildings on State St south of I-94. Never saw anything more for this beyond the real estate listing.
Avant
1400 S Maple Rd
Under Construction
253 condos, consisting of 174 apartments and 79 townhomes, in the southwest corner of the city. Each unit is 1 to 3 bedrooms. An update reducing the scope of this project is being floated as of Spring 2019. Site plan ammendents are ongoing as of 2021.
Balfour Senior Housing
2830 S Main St
Complete
Senior housing near Briarwood. Mix of independent living, assisted living, and memory care.
Banyan Court
1654 S Maple Rd
Complete
8 single family home subdivision off of S Maple in the south west corner of the city. Each house will be around 1800 square feet in size and will be marketed at empty nesters. 3 to 4 bedrooms per house. Price range is $415,000 to $455,000.
Beekman on Broadway
1200 Broadway St
Complete
Large apartment building in lower town. Includes the parking garage shared with an adjacent building. Part of the larger 1140 Broadway project.
Biological Sciences Building
1139 N University Ave
Complete
The University of Michigan's new home for the biology department and the Museum of Natural History.
Blue Heron Pond
2536 W Liberty
Complete
Townhome and flats subdivision on the west side of the city that is partially complete. A total of 64 units across 10 buildings are planned. Each unit consists of 2 to 3 bedrooms. Construction appears to be wrapping up as of 2020?
Briarwood Sears Redevelopment
300 S Maple
Proposed
Possible new development to replace the old Sears building at Briarwood. Could include a 4 story office building, small grocery store, and a residential component.
Brightdawn Village
2805 Burton
Under Construction
120 market rate apartments across 4 buildings in the southeast corner of the city. Each unit is 2 to 3 bedrooms. This is the location of previous proposed projects over the past decade, and a homeless encampment until 2014. Rejected by city council based on it not conforming to zoning or to the master plan vision for the area. The developer came back with a smaller by-right proposal that was approved. As part of this development Burton Rd will be connected to Eli Drive, but with a locked gate for emergency access only.
Bristol Ridge
2750 Pontiac Trail
Under Construction
69 townhomes on the north side of the city off Pontiac Trail. The units will be owner occupied and ~1850 square feet in size. The target market is young professionals and empty nesters. Construction under way or nearly so as of late 2021.
Broadway Park
841 Broadway St
Under Construction
Redevelopment of the vacant MichCon / DTE site along the Huron River just north of the train station. The initial concept calls for 100 condos, retail space, a hotel, and lots of open space. To be built in two phases.
Bryant Community Center Addition
3 W Eden Ct
Complete
Connector for the two existing Bryant Community Center buildings on the far south side.
Catherine St Affordable Housing
121 E Catherine
Proposed
Conceptual affordable housing development on the city owned lot at the northwest corner of Catherine and Fourth in Kerrytown. A range of options are being considered: 57 to 93 units of housing, 4 to 6 floors tall, up to 13,000 sqft of ground floor retail, and 40 to 90 parking spaces. All concepts are for a 100% afordable housing development. The existing parking lot has 49 spaces. The data shown here is for the "middle" option: 5 floors.
Central Campus Classrooms Building
North University
Complete
100,000 square foot addition and 134,000 square foot renovation of the Ruthven Museums Building. The Museum of Natural History is moving to the new Biological Sciences Building upon its completion. University administration, classrooms, and dry lab space will use the renovated and expanded museums building. The 1964 wing of the building will be demolished and replaced with a new building for large classrooms.
Central Campus Recreation Building Replacement
Washtenaw
Under Construction
Complete replacement of the Central Campus Recreation Building.
Circle K Rebuild
1420 E Stadium
Complete
Tear down and rebuild of the existing Circle K gas station at the corner of Packard and Stadium.
College of Pharmacy Building
Huron St
Approved
New home for the university College of Pharmacy. The school will move out of its existing building behind CC Little on Church St.
Concord Pines
660 Earhart Rd
Under Construction
Luxury home subdivision from Toll Brothers on the northeast side.
Concordia Gym Addition
4090 Geddes Road
Stalled
Gym expansion on Concordia's campus. No updates in a long while as of summer 2018.
Crestview Condominiums
904 S Main
Complete
4 unit townhouse development at S Main and Davis. This is targeted at empty nesters and young professionals and is very similar to the recently completed Davis Row a little further down Davis. Priced from $879,000 for 4 bedrooms, 3.5 bathrooms over 2800 square feet.
Davis Row
309 W Davis
Complete
4 unit townhouse development south of downtown.
Dean Road Transportation Facility
Complete
University of Michigan bus operations and maintenance facility. Would replace the north campus laundry building. A previous proposed transportation operations center that was supposed to be built nearby was cancelled in 2016.
Dental School Addition
1011 N University
Complete
An expansion of the university's dental school building to largely fill in the existing courtyard. A 176,000 square foot rennovation of the existing building is part of this project.
Department of Dance Building
1100 Baits
Complete
Addition to the University's School of Music for the Dance Department. Proposed at the May 2018 Regents Meeting.
Detroit Flatiron
544 Detroit St
Complete
Triangular building at the north end of Kerrytown with office space for Maven Development on the first floor and one residential unit on the second and third floors.
Elroy's Place
321 N Main St
Stalled
Retail, office, and residential space on North Main St. The planned retail use is for personal fitness, yoga, and a spa. The residential space is planned as 4 or 5 apartments. Formerly this was the site of the proposed bath house. This project appears to be moving towards construction as of February 2019. Site plan approal extended in 2021. No updates since then?
Fairfield Inn Downtown
300 W Huron St
Approved
Downtown hotel west of Main Street. Existing buildings on site demolished in 2022. Construction starting in 2023?
Federal Building Redevelopment
200 E Liberty.
Concept
Very early discussions about possible redevelopment of the downtown federal building sitel.
Fingerle Arbor Bar
545 S Main
Stalled
Proposed brewery and restaurant on the site of old Fingerle Lumber storage buildings. Plans include reusing and expanding the existing structures. No updates since early 2019.
Ford Motor Company Robotics Building
Complete
University of Michigan building for robotics research on North Campus.
Foundry Lofts
413 E Huron
Complete
Student targeted apartment building between central campus and Main Street.
Game Day Condos
1300 S Main St
Stalled
5 unit condo complex across the street from Michigan Stadium. Each unit has two bedrooms and is to be marketed as second homes for Michigan football fans. Last permit activity for this development was in late 2018. As of 2020 the existing house on the site is being permitted as a rental properly.
Gift of Life Addition
3861 Research Park
Complete
Addition to combine the existing buildings for Gift of Life Michigan. Located off South State south of 94.
Glen Hotel
Under Construction
162 hotel rooms, 24 apartments, and ground floor retail near the University Medical Center. Modifications to plan being reviewed as of early 2019. Building permit issued in October 2021.
Hampton Inn West
2910 Jackson
Complete
Hotel on the far west side of the city.
Henry Street Residential
814 Henry St
Complete
11 unit student / young professional townhome focused development to the south of campus off of Stadium.
Hickory Way Apartments by Avalon
1120 S Maple Road
Complete
70 apartments in two 3 story buildings. Mostly one bedroom units, some two bedroom units. Reserved for people making under 50% of the area median income, some units for people making under 30%.
Hideaway Lane
2000 Traver Rd
Approved
Completion of a partially built condo community on the north side of the city. 35 new units, mostly duplexes, to be added. 34 two bedroom units and one 3 bedroom single family home. Slowly nearing construction as of later 2022?
Hillside Memory Care Addition
312 Glendale Dr
Complete
Memory care addition to the existing Hillside Terrace retirement community on the west side of the city. Consists of 24 rooms.
Hilton Home2 Hotel
361 W Eisenhower Pkwy
Approved
115 room hotel just west of Briarwood Mall. Existing office building on the site demolished in 2021. Site prep began in late 2022?
Holiday Inn Express
3853 Research Park Drive
Complete
114 room hotel on the far south side of Ann Arbor.
Homewood Suites
2457 S. State St
Under Construction
107 room hotel on S State St near the new athletic campus. Construction close to starting as of early 2019.
Hospital Expansion at Markley
Hub on Campus
603 E Huron
Complete
124 apartments targeted at students. On Huron St near Central Campus. Each unit ranges from studios to 4 bedrooms in size. Monthly lease ranges from $1200 - $2000 per person per month depending on the unit size.
Hyatt Place
3223 S State St
Complete
142 room hotel with 2,800 sqft retail space in front
Jackson Ave Hotels
2800 Jackson Ave
Approved
Two new hotels on Jackson Ave just past 94 on the site of the old Michigan Inn site. Based on the site plans the hotels may be an Aloft and a Home2 Suites. Nearing construction as of early 2023?
Jeff T. Blau Hall
Complete
New building at the University's Business School. Replaced an existing building. This project also included the renovation of other space in the school.
Kingsley Condos
314 W Kingsley St.
Complete
51 condos consisting of 1 to 3 bedrooms in between Kerrytown and Water Hill, north of downtown. This is the former site of JC Beal Construction. The target market looks to be empty nesters and young professionals. Sample pricing: ~$600,000 for 2 bedrooms and bathrooms over 1,400 square feet.
Kingsley Parkside
213 W Kingsley
Complete
5 story 3 unit luxury condo building north of downtown. 2 bedrooms per unit. $959,000 for a 1600 square foot unit.
Kingsley West
121 W Kingsley
Complete
Condo complex north of downtown.
LA Fitness
155 N Maple
Complete
Replacement of the old English Gardens building with new construction for an LA Fitness.
LSA Addition
500 S State
Complete
One floor addition onto the back of the existing LSA Building. A 24,000 square foot renovation of the building is also part of this project.
Leinweber Computer Science and Information Building
Hayward
Under Construction
Addition to the Beyster Building on the Unversity's North Campus to serve as additional space for the computer science program and as a new home for the School of Information. Image from the 2008 North Campus master plan update showing possible building sites.
Liberty Townhomes
2658 W Liberty St
Approved
52 townhouse style apartments on the far west side of Ann Arbor. 3 bedrooms per unit. Approved with a guideline to not permit left turns leaving the development. Moving towards constructin as of early 2023.
Lockwood of Ann Arbor
3365 Jackson Rd
Stalled
Senior independent living facility on the far west side. 20% of units to be dedicated as affordable housing. Rejected by the city council in March 2019.
Lockwood of Ann Arbor
2195 E Ellsworth Rd
Under Construction
Senior housing apartment building in the southeast corner of the city. A similar plan on the far west side was rejected by city council.
MMG Plymouth Mixed Use Development
3261 Plymouth Rd
Under Construction
Tear down of most of the Plymouth Rd Red Roof Inn for a new hotel and rebuild of the Big Boy's restaurant for a new eatery.
MSGCU Credit Union
2151 W Stadium
Under Construction
New building on W Stadium for a Michigan Schools and Government Credit Union.
Madison on Main
101 W Madison St
Under Construction
26 unit apartment building with 1267 sqft of retail space just south of downtown. This project was approved by the city council in 2015 but appears to have stalled out since then. Possibly moving towards construction as of summer 2019? Unclear because it sounds like the developer is starting construction, but the main approvals have expired.
Main + Davis Apartments
913 S Main
Approved
6 unit student focused apartment building south of downtown. Construction started as of 2023?
Main St Affordable Housing
353 S Main
Concept
Possible affordable housing at the site of the city owned "Palio Lot". Different options are being considered, ranging from 40 to 90 units, and from 6 to 10 floors in height. The data shown here is from the 6 story concept. Development being considered as a 100% affordable housing project.
Main on the Park
542 N Main St
Complete
4 luxury townhomes on North Main St.
Mallets Woods 2
3300 Cardinal Ave
Stalled
19 single family home subdivision on the south east side of the city. The houses will have 3 to 4 bedrooms and be up to 2000 square feet in size. Development plans ultimately fell through and the city purchased this land to be a designated natrual area.
Maple Cove 3
1605 N Maple Rd
Under Construction
Three additional buildings for the Maple Cove apartment complex at Miller and Maple.
Maple Cove Building 1
1649 N Maple Rd
Complete
Four story apartment buildings with 18 units. Units are 1 to 2 bedrooms. One bedroom unit renting for $1240.
Maple Cove Building B
1645 N Maple Rd
Complete
Four story apartment buildings with 18 units. Units are 1 to 2 bedrooms.
Maple Cove Condos
Maple Village Ct
Under Construction
Seven lot single family subdivision part of the Maple Cove project. Under construction as of 2018. Partially complete as of 2021.
Maple Shoppes Building #2
512 N Maple Rd
Stalled
New retail building on the same property as the existing Aldi at Maple and Dexter. This project was approved by the city council in 2016 but no permit activity has occurred since then so this may be stalled now. An earlier version of this project also was canceled after the site plan expired.
Maple Village Restaurant
N Maple
Stalled
New restaurant building proposed in the parking lot of Maple Village. No updates since 2018.
Meadowview Condominiums
2250 Ann Arbor Saline
Stalled
Condo building proposed south of downtown. The units range in size from ~800 to ~2000 square feet and 1 to 3 bedrooms. This project was approved in 2015 and seems to becoming active again as of early 2018. Site plan extenstion requested in mid 2019. Site work underway as of late 2019 / 2020? Seems stalled again as of 2023.
Michigan Medicine Clinical Inpatient Tower
Ann St
Under Construction
New medical center building mentioned in the FY2019 UM capital outlay master plan. 264 patient beds planned.
Mitchell School Addition Phase 1
3550 Pittsview
Complete
Six new classrooms as Mitchell Elementary School on Ann Arbor's southeast side.
Mitchell School Addition Phase 2
3550 Pittsview Dr
Stalled
Planned second phase of additional space for Mitchell school. No word on this in a long while as of summer 2018. Two phases of modular classrooms have been added to the southwest corner of the school in the mean time. It looks like in the long term AAPS is going to build an entirely new Mitchell school.
Montgomery Houze
212 S Fourth Ave
Complete
41 apartments with ground floor retail downtown. Mix of studios, one and two bedroom units. This is a multi-story addition to an existing building. The project involves restoring the classic look of the old Montgomery Ward department store that this structure used to house.
Munger Grad Residences
540 Thompson St
Complete
University of Michigan graduate student dorm for 600 students.
Near North
700 N Main St
Approved
22 townhouse condos on North Main Street. This has been the site of stalled proposals over the years. Appears to be slowly moving towards construction as of early 2023.
New Fire Station 4
Proposed
Rebuild of Fire Station #4 on the city's east side.
New North Campus Undergraduate Housing
Concept
New university housing replacing Northwood III. The old Nothwood buildings were demolished in 2022. This project was then paused in favor of new housing on Central Campus.
Nine99
999 Maiden Ln
Approved
Condo building part of the larger 1140 Broadway project. This portion of the development has been put delayed as of July 2019 while the other buildings move forward. As of late 2021 this site is being used as a staging area for construction of the building at 1100 Broadway.
North Maple Estates
701 N Maple
Complete
Affordable housing on Ann Arbor's northwest side run by the Ann Arbor Housing Commission. Replaced / refurbished the existing affordable apartments on this site.
North Oaks Townhomes
2999 Nixon Rd
Under Construction
264 3 to 4 floor townhouses in new subdivision on the far north side of Ann Arbor. Formerly known as Nixon Farm South. Move ins began in fall 2017, deleveries ongoing.
North Oaks Villas
3381 Nixon Rd
Under Construction
208 carriage style home subdivision on the far north side of Ann Arbor. Exact mix of units to be determined by individual purchasers. Formerly known as Nixon Farm North. Deleveries to owners ongoing as of 2018.
North Sky
2701 Pontiac Trail
Complete
195 units, mostly single family with 2 or 3 bedrooms. One multi family building with 56 2 bedroom units. This project has been in the works for years. The houses are to be priced starting in the $400k range for 2,500+ square feet. Deleveries expected to begin in 2019.
OakCliff Apartments
2225 Traverwood
Complete
Apartment community off the Plymouth Road corridor.
Old YMCA Lot
Fifth and William
Concept
Site of the former YMCA in downtown Ann Arbor. The old structure was demolished in 2008 and has been marked for mixed use redevelopment since then. The property is currently the subject of a legal dispute between the city and developer.
Owl Creek Apartments
3380 Nixon Rd
Complete
Rental apartment complex on the far north side of Ann Arbor. 264 apartments, mostly 1 and 2 bedroom units, some 3 bedroom units. Split across three 3 story apartment buildings and one smaller clubhouse building. Formerly known as Woodbury Club and The Annex.
Pittsfield Retail Center
3570 Washtenaw
Complete
Additions to an existing strip mall on Wasthenaw across from ArborLand.
Plymouth Green Crossing Building 3
3455 Plymouth Rd
Stalled
Proposal to complete the third building of Plymouth Green Crossing as a one story retail structure instead of three stories of mixed use like the other two buildings on the site. Proposal was withdrawn in 2020.
Rainbow Child Care
2600 Nixon Rd
Stalled
Child care facility on the north east side of the city. Cancelled after Ann Arbor Public Schools purchased the property in January 2019. The school district has no plans for the site.
Reinhart Project
2275 W Stadium
Complete
New office building for Reinhart Realtors and others on West Stadium.
Residence Inn Downtown
120 W Huron St
Complete
Downtown hotel with ground floor retail west of Main Street.
School of Kinesiology Building Addition
830 N University Ave
Complete
Addition to the Kraus building to fill in the interior courtyard. A rennovation of the 160,000 square foot building is also a part of this project. This will begin once the Biology department has moved to the new Biological Science Building. The department of Kinesiology will move into the Kraus Building after the construction on it is complete.
School of Music Brehm Pavilion
1100 Baits
Complete
Addition to the University's School of Music. Renovation of existing space was also part of this project.
School of Nursing
426 N Ingalls St
Complete
New home for University of Michigan's School of Nursing north of central campus and just west of the medical campus.
Six11
611 E University
Complete
14 story 90 unit student housing tower with 3,498 square feet of first floor retail. Units mix consists of studios and 4, 5, and 6 bedroom apartments. Per bedroom rates run from $1250 to $2000 a month.
South Athletic Complex
S State St
Complete
New home for the University of Michigan's track and field, cross country, lacrosse, soccer, and women's rowing teams.
South Pond Village
3850 E Huron River Dr
Stalled
73 single family house subdivision behind Arborland. As of February 2018 a new proposal for this site is being floated consisting of 257,000 sqft of single floor retail - essientially an expansion to Arborland. Site plan extension requested in mid 2019. Extension again made in 2021. The site was later under consideration for purchase from Ann Arbor Public Schools, but that did not go through.
Stadium View Condos
450-460 W Stadium
Complete
4 3000+ square feet condo units with 4 bedrooms and penthouse roof decks. One unit is listed for $1.2 million. The market for these units appears to be rich football fans looking for a second home? Or Airbnb property managers?
Standard at Ann Arbor
405 S Main
Complete
New apartment building proposed for the DTE site on Main Street. Some ground floor retail included at the Main St / William intersection. Judging from the unit sizes and bedroom counts, this will be a student oriented development. Site work underway in late 2020.
State Street Village
2225 S State
Complete
Two apartment buildings and one smaller leasing office on South State Street.
Staybridge Suites
3850 Research Park
Complete
Hotel off of South State south of 94.
The Collective on Fifth
319 S Fifth Ave
Stalled
Project on the library lot downtown consisting of 360 residential units, 131 hotel rooms, 20,000 sqft of office, 3300 sqft of retail, and a 12,000 sqft public plaza. Cancelled as a result of proposal A in the November 2018 election. Efforts to determine what to do with the lot are ongoing.
The Gallery
441 S Ashley St
Complete
22 unit condo building just south west of downtown. 21 two bedroom units and 1 three bedroom unit for a total of 45 bedrooms. Demolition of the existing buildings on the site is underway as of February 2019.
The Garnet
325 E Summit
Under Construction
Small condo building near the train station. Rezoning initially rejected by city council, but came back as a PUD.
The George
2502 Packard St
Complete
Long delayed mixed use complex with 249 apartments and 24,000 square feet of retail. Consists of mostly 1 and 2 bedroom units, some studios and 3 bedroom units. Formerly known as Packard Square.
The Mark
318 W Liberty
Complete
Small condo building just west of downtown.
The One
2601 Pontiac Trail
Complete
221 unit apartment community for university students on Ann Arbor's north side. Multiple duplexes and townhomes, and a clubhouse with a pool. This would be the first large development tageted at University of Michigan students a significant distance from campus. Shuttles would run between the complex and Central / North Campus. Rejected by the city council in September 2018. A modified version of the same proposal was then approved in July 2019 to avoid a lawsuit from the developer. Looks to be targeting a summer / fall 2021 completion. Formerly known as Cottages at Barton Green. Partially complete for the fall 2021 semester.
The Summit Townhomes
2081 E Ellsworth Rd
Stalled
24 townhouses south of I-94. The site plan states that these townhomes will be around 1300 sqft in floor area. This project had been stalled for a while but appears to possibly be coming back to life. Site plan approval was extended in 2019 but development seems dormant since then. The site is owned by Ann Arbor Schools.
The Yard on South Main
615 S Main St.
Complete
229 unit student targeted apartment with 6,200 square feet of ground floor retail. Units are mostly studios, 2 bedrooms, and 3 bedrooms. Formerly known as The Residences at 615 S Main. Rents run from $1000 to $1900 a month per bedroom.
Traverwood Two Addition
2900 Huron Parkway
Complete
Addition to connect two office buildings, enclosing part of the parking lot and converting it to a courtyard.
Trotter Multicultural Center
428 S State St
Complete
State street located replacement for the University of Michigan's existing Trotter Multicultural Center to the east of central campus.
University Housing Project
Approved
Large new Central Campus dorm on the site of Elbel Field. The marching band practice field will move a block north to the old Fingerle Lumber site.
University of Michigan Golf Clubhouse
500 E Stadium
Complete
Replacement of the University golf clubhouse.
Upland Green II
1777 Plymouth
Complete
Apartment building just north of North Campus. Second phase of the Upland Green development.
Veridian at County Farm
2270 Platt Road
Under Construction
99 units of market rate housing. Includes a small retail component. Developed by Thrive. Linked to the affordable housing development to the north. Nearing construction as of late 2021.
Veridian at County Farm The Grove
2270 Platt Road
Approved
50 units of affordable housing across nine buildings. Developed by Avalon. Linked to the adjacent market rate project by Thrive to the south.
Vic Village East
1209 S University
Stalled
Student targeted apartment tower on South University. 166 beds across 34 apartments. 1760 sqft of retail on the ground floor. This proposal looks to have been withdrawn in early 2018. Two of the three buildings on the site were demoslished in late 2017 / early 2018. As of early 2018 the site is being used as storage for the Vic Village North project down the street. Formerly known as the Collegian East. A March 2019 MLive article noted that the new Vic Village South project had been bumped ahead of the east project.
Vic Village North
1107 S University
Complete
Student targeted apartment building on South University with 57 apartments totaling 261 bedrooms. Consists mostly of three to six bedroom units. 4 retail spaces at the base. Formerly known as the Collegian North.
Vic Village South
1100 S University
Under Construction
A student focused apartment tower on the south side of S University. Approved with site plan work starting soon as of late 2020. May be downsized from the original proposal somewhat?
Village of Ann Arbor
1680 Dhu Varren Rd
Proposed
164 homes for sale and 440 rental units on large site on the north side of the city.
W Stadium Bank and Storage Facility
2060 W Stadium Blvd
Stalled
Two buildings on West Stadium: A three story bank / office building and a four story self-storage facility. The plan was ultimately killed by a rejection of both the self-storage facility and the drive-thru at the bank.
Wall Street West Parking Structure
Wall St
Complete
A second parking structure on Wall Street for University of Michigan Medicine. 1080 spots replacing a 130 space lot.
White State Henry Apartments
1525 S State
Complete
Replace existing 28 unit affordable housing building with a new 32 unit one with an onsite community center. To consist of 23 one bedroom units and 9 two bedroom units for a total of 41 bedrooms. To be affordable for tenants up to 60% of area median income.
Zoller Building
3900 Research Park Drive
Complete
Single floor headquarters for Zoller, a manufacturing supplier, on the far south side of Ann Arbor. Mix of commercial and light industrial uses.